![]()
Somerset
County, New Jersey
Note: Your project may require prior approvals from Zoning, Health, Engineering, Fire Prevention, Water Dept., Sewerage Authority, Historic Committee, Soil Conservation and/or other outside agencies. It is the applicants responsibility to contact those agencies to determine requirements. SURVEY MAP - CONTACT THE ZONING OFFICER FOR INFORMATION REGARDING SURVEY REQUIREMENTS. TWO COMPLETE
SETS of construction plans/drawings. How complete your plans/drawings
must be is determined by the extent of your project. Basically, plans/drawings
must show where, how and with what material you will be constructing
the "project". You must include information AS NECESSARY
such as footings, foundation, structural sections, exterior elevations,
floor plan, typical wall section, and framing details. Include size
and spacing of ceiling or floor joists, wall studs, roof rafters, primary
beams, doors & windows; size of framing members (rafters, studs
joists, etc.), floor to ceiling height, electrical wiring details &
diagrams, plumbing schematics and diagrams, location of smoke detectors,
alarms, etc. All dimensions need to be exact. Label everything on your
drawings. Plans/drawings may be submitted by the owner of a single family home who has prepared his own plans and will be doing his own construction, alteration or repair of a structure which is used or intended to be used exclusively as his personal residence. The homeowner must print name, street address, block and lot on each page of the plans.
THE CONSTRUCTION CODE DEPARTMENT OFFICE HAS PREPARED "PACKAGES" FOR SOME OF THE MORE COMMON PROJECTS. PLEASE BE SURE TO GET THE PACKAGE FROM US, AS IT WILL CONTAIN FORMS AND/OR INFORMATION EXCLUSIVE TO FRANKLIN TOWNSHIP A ZONING APPLICATION
WILL BE PROVIDED WITH THE OTHER NECESSARY FORMS WHEN REQUESTED THROUGH
THE CONSTRUCTION CODE ENFORCEMENT OFFICE. RETAIL FOOD ESTABLISHMENTS MUST ALSO APPLY TO THE HEALTH DEPARTMENT. |