Roads to be paved for 2012
Due to a complex schedule and weather conditions may be done in any order.

DeMott Lane (from Scaletti Court to New Brunswick Road),

Girard Avenue (from Hamilton Street to new pavement),

Girard Avenue (from Elmwood Avenue to Dead End),

Hillcrest Avenue (from Easton Avenue to Dumont Street),

Mettlers Road (from Amwell Road to Weston),

New Brunswick Road (from Cedar Grove Lane to short of Elizabeth Avenue),

Pierce Street (from Davidson Avenue to Cedar Grove Lane),

Schoolhouse Road (from Elizabeth Avenue to Belmont Drive)

Willow Ave. (from 15th Street to New Brunswick Road)

Belmar Street,

Burns Street,

Hemlock Lane,

Hickory Road,

Hillview Avenue,

Juliet Avenue,

Pinecrest Drive,

Pin Oak Lane,

Simpson Road,

Skillmans Lane,

Society Hill Boulevard,

Wade Avenue

Winthrop Road

All such roadways being located within the Township. Such overlay and resurfacing to consist of, as required, milling, excavation, repaving with pavement having a useful life or durability at least equal to that of a Class C Roadway (as defined under the Local Bond Law) and striping, including minor drainage and curbing work, as needed.